Broadmead Road Viaduct Drainage
March 2025
Rhinoceros complete installation of drainage channels to 7 expansion joints on Broadmead Road Viaduct. The final joint falling within the section over the London Underground Central Line tracks south of Woodford Station. Engineers expect this drainage system to halt the ingress of water to the structure and thus slow down the corrosion and concrete damage sustained by the viaduct over several decades.