Millfield House Footbridge

Rhinoceros have completed surface preparation on the iron bridge at Millfield House, Enfield. Preparation was done to St3 and followed by applicationof a Jotun paint system - Penguard HB primer to 100 microns, Jotamastic 87 Intermediate coat approx 200-250 microns and two coats XP Hardtop in BS 381C 223 final dfts in excess of 300 microns. An innovative fibre reinforced plastic deck, manufactured by Polydeck of Bristol, was then installed. 

 

Previous
Previous

Folkestone Harbour Swing Bridge

Next
Next

Lea Navigation