Windmill Road Subway

Rhinoceros complete the repair and repainting of parapet railings and timbers at Windmill Road Pedestrian and Equestrian subway. This work included the replacement of defective timber followed by sanding down to sound wood the existing timber rails, the stripping back to sound clean metal coating of all posts. All timber has been coated with 3 coats of Sikkens Cetol Woodstain which should last in excess of 7 years. Steel posts have been primed with Sigmacover 280 epoxy primer and finished with SigmaDur  550 two pack polyurethane in BS colour 14 C 40.

latest news

Newbury Avenue Bridge works
30.04.2021

A Rhinoceros team has completed Remedial Painting to Newbury Avenue Bridge. Works inc... Read More

Lastest Case Study

Case Study: The Chine
16.07.2020

The Chine, located in the Grange Park suburb near Enfield was laid out du... Read More

Client Login