Nottingham  Tram Pole Remedial Painting

Rhinoceros completed the remedial painting of 33 overhead powerline poles on the Nottingham Express Tramways line to Station Street. The work was completed within 18 nights as programmed. Our operatives worked from self propelled booms supplied by Nationwide Access Hire. We removed all of the existing failed coatings and prepared the surface to clean metal coating. The new coating system using Dacrylate Paints consisted of T-wash etch primer, Epidac 2 HB high build epoxy aluminium primer, Epidac 2 HB epoxy undercoat followed by Marguard Easyclean AGS a high solids two pack polysiloxane finish in NET silver.

latest news

Lea Valley Road bridge over TWA Lane
26.10.2020

 ... Read More

Lastest Case Study

Case Study: The Chine
16.07.2020

The Chine, located in the Grange Park suburb near Enfield was laid out du... Read More

Client Login