Monument subways: period detail restorations

  The final straw that brought the refurbishment of the pedestrian subway system at Monument tube station to the front of the queue.  A double-decker demolished granite plinths at one of the street exits.  But the system had been overdue a major refurbishment and RHINOCEROS were contracted to bring restore it to its original Art Deco glory.  Our teams took care to make sure the details were all just right:

      

       

 

latest news

Bridge over Salmons Brook
06.11.2019

Phase One of works to a bridge carrying The Chine over the Salmons Brook in Enfield N... Read More

Lastest Case Study

Harold Court Subway
27.04.2018

 The Harold Court Road subway system passes beneath the A12, just inside the M25. Dam... Read More

Client Login